Prepare
Review drawings, photographs, manuals and known issues before the visit.
Engineering service
On-site investigation of hazards, access, tasks, interfaces and constraints before a guarding concept is defined.
A guarding survey captures the machine, hazards, operator tasks, maintenance requirements, available space and existing controls. It provides the evidence needed to create a proportionate safeguarding concept and a reliable quotation.
Scope
The exact boundary is agreed before work starts and coordinated with your production, engineering and safety teams.
Delivery
Review drawings, photographs, manuals and known issues before the visit.
Measure the area and walk through normal and abnormal tasks with relevant site personnel.
Separate immediate defects, practical upgrades and longer-term improvement opportunities.
Issue an agreed output such as a survey note, concept, scope or formal project report.
Outputs
Outputs are proportionate to the service and defined in the proposal.
Discuss this serviceService questions
It is helpful but not always essential. Drawings, electrical information, previous risk assessments and operating procedures improve the quality and speed of the review.
Yes. We can structure a site-wide survey by line, area or risk priority and provide a phased improvement plan.
Not necessarily. The scope should state whether the output is a guarding-focused survey, a broader work-equipment assessment or a design input for a specific project.
Related project scope
Start with the hazard, access task and stopping behaviour
Send photographs, a layout or a short description. We will help define the survey, design and integration scope.